24/7 emergency electrical call-outs across London

020 8129 3833
Modern consumer unit being inspected by an electrician

Fuse box upgrades

Consumer unit installation in London

Assessment, replacement and testing of consumer units for homes, rental properties and commercial premises across London.

NICEIC approved24/7 call-outsLondon coverage

Simply Electrical Contractors

Modern circuit protection, properly assessed

The consumer unit distributes electricity around the property and contains protective devices for the individual circuits. Replacement may be considered when equipment is damaged, obsolete, unsuitable for planned work or lacks the protection required for the installation.

A consumer unit should not be selected in isolation. Existing circuits, earthing and bonding arrangements, available space and the condition of the installation all need to be assessed before an upgrade is specified.

Simply Electrical Contractors undertakes consumer unit work across London. The completed installation is tested and the relevant certification for the work is provided and explained.

Work this service can include

  • Replacement of older fuse boxes
  • Consumer units for property upgrades
  • Circuit-protection assessment
  • Testing of connected circuits
  • Certification for the completed installation

What to expect

A clear route from enquiry to completion

Details vary by property and service, but the process is built around assessment, explanation and appropriate testing.

Survey the installation

The existing board, circuits and earthing arrangements are considered before equipment is specified.

Install and label

The new consumer unit is fitted, circuit information is recorded and disruption is managed as agreed.

Test and certify

The connected installation is tested and the appropriate documentation is issued for the completed work.

Common questions

Useful information before you enquire

For advice about a specific property, contact the team with the postcode and job details.

Not automatically. Condition, suitability and the protection provided should be assessed before deciding whether replacement is appropriate.

Yes. A consumer unit change requires an agreed period without power. The likely duration and access requirements are discussed before the work.

Yes. Testing is an essential part of consumer unit work and may identify existing defects that need attention.

The appropriate electrical certification for the completed installation work is provided after satisfactory testing.

Tell us what the property needs

Send the postcode, property type, work required and preferred timing for a clear next step.

Contact the team
Call 020 8129 383324/7 emergency line